Wuhan Hospital, China
Images of a timelapse were spread all over social media and news outlets in February 2020 as China built a new hospital facility in around 2 weeks 'from scratch'. News outlets reported that the facility has around a 1,000-bed capacity and was designed, procured and built-in this timescale.
It is more likely that the hospital facility is part of a larger state-run emergency action plan which has been sitting designed on a shelf especially for such an event after the last SARs virus outbreak in China.
Regardless if the modular unit construction or design is included in the timescale, it is still an amazing feat to build such a scale of off-site modular building in such a short space of time, and questions are now being asked about why this is not being implemented across the construction industry. The concept is not new, and the Egan Report and Latham report both attempted to resolve issues with wastage in the construction industry.
Further studies will no doubt be carried out on the back of these buildings construction timescales to see what lessons can be learned to improve construction timescales globally.
[edit] Related articles on Designing Buildings Wiki
- Cancer Centre at Guy's Hospital
- Conserving Ruchill Hospital water tower
- Fountaine Hospital Almshouse
- How a Complex Hospital Building for Orthopaedic Services was Constructed in Less Than Four Months
- How to Develop the Most Constrained Hospital Sites to Reduce Waiting Times and Improve Patient Care
- Khoo Teck Puat Hospital
- North Middlesex University Hospital Maternity Unit
- Researching the history of Fountaine Hospital Almshouse
- Sea Sand Tower Hospital Queen Elizabeth, Kota Kinabalu, Malaysia
Featured articles and news
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.